Need Some Help?
We can help you find the information that meets your research needs.
Please call us at
+886 2 27993110
or send an email to us at standards@hintoninfo.com

Organization / Document #
BSI
Search Result: About 37113 results.

Breadcrumb

  • 【Organization】BSI
  • 【Document #】BSI BS ISO 20819
  • Plastics – Wood-plastic recycled composites (WPRC) – Specification

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI BS EN ISO 11297-1
  • Plastics piping systems for renovation of underground drainage and sewerage networks under pressure Part 1: General

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI BS EN ISO 11296-1
  • Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks Part 1: General

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI BS EN ISO 11298-1
  • Plastics piping systems for renovation of underground water supply networks Part 1: General

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI BS ISO 15552
  • Pneumatic fluid power - Cylinders with detachable mountings, 1 000 kPa (10 bar) series, bores from 32 mm to 320 mm - Basic, mounting and accessories dimensions

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI PD IEC/TS 62361-102
  • Power systems management and associated information exchange — Interoperability in the long term Part 102: CIM — IEC 61850 harmonization

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI PD IEC/TR 62361-103
  • Power systems management and associated information exchange - Interoperability in the long term Part 103: Standard profiling

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI PD IEC TS 62989
  • Primary optics for concentrator photovoltaic systems

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI PD IEC TS 62647-4
  • Process management for avionics – Aerospace and defence electronic systems containing lead-free solder Part 4: Ball grid array (BGA) re-balling

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active
  • 【Organization】BSI
  • 【Document #】BSI PD IEC/TR 62240-1
  • Process management for avionics - Electronic components capability in operation Part 1: Temperature uprating

  • 【Date】2018/4/30
  • 【Language】English
  • 【Status】Active