
DoD
Search Result: About 41710 results.
Breadcrumb
- Home
- Industry standards
- Search Result
- 【Organization】DoD
- 【Document #】COE COE ETN 81-4 SUPPLEMENT 1
CONSERVING ELECTRICAL ENERGY
- 【Date】1981/6/8
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】SH MIL-F-16377/25A
FIXTURES, LIGHTING; INCANDESCENT, GENERAL LIGHTING 110 WATTS, 120 VOLTS, EXPLOSIONPROOF, SYMBOLS 48.2 AND 68.2
- 【Date】1981/6/5
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】GL CCC-C-461C (1)
CLOTH, TWILL, UNIFORM COTTON
- 【Date】1981/6/3
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】11 AF M ATC 86-8 SUPP 1
AIRFIELD AND AIRSPACE CRITERIA
- 【Date】1981/6/1
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】GL MIL-C-43876A
CLOTH, WIND RESISTANT, OXFORD, NYLON AND COTTON, QUARPEL TREATED
- 【Date】1981/6/1
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】ARMY ARMY AR USACE 70-63 SUPP 1
DOD IN-HOUSE RDTE ANNUAL ACTIVITIES REPORT (RCS: DD-DR&E(A)1041)
- 【Date】1981/6/1
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】COE COE ETN 81-7 SUPPLEMENT 1
FACILITIES ENGINEERING MAINTENANCE AND REPAIR AIR CIRCUIT BREAKER MAINTENANCE
- 【Date】1981/6/1
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】COE COE ETN 81-7
FACILITIES ENGINEERING MAINTENANCE AND REPAIR AIR CIRCUIT BREAKER MAINTENANCE
- 【Date】1981/6/1
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】11 AF R TAC 89-1
FACILITY CONSTRUCTION REPORTING CONSTRUCTION TIMELINESS OF FACILITY PROJECTS BY CONTRACT RCS: TAC-DEE(M)7401
- 【Date】1981/6/1
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】11 AF P88-27
FACILITY DESIGN AND PLANNING CATHODIC PROTECTION TESTING AND INSTRUMENTS
- 【Date】1981/6/1
- 【Language】English
- 【Status】Active