Need Some Help?
We can help you find the information that meets your research needs.
Please call us at
+886 2 27993110
or send an email to us at standards@hintoninfo.com

Organization / Document #
AWS
Search Result: About 455 results.

Breadcrumb

  • 【Organization】AWS
  • 【Document #】AWS B2.1-1-205
  • Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 1-1/2 Inch Thick, E6010 (Vertical Uphill) Followed by E7018 (Vertical Uphill), As-Welded or PWHT Condition, Primarily Pi

  • 【Date】1905/6/18
  • 【Reaffirmed Date】(R 2007)
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS B2.1-1-208
  • Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 1-1/2 Inch Thick, E7018, As-Welded or PWHT Condition (Primarily Pipe Applications)

  • 【Date】1905/6/18
  • 【Reaffirmed Date】(R 2007)
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS B2.1-1-204
  • Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 3/4 Inch Thick, E6010 (Vertical Downhill Root with the Balance Vertical Uphill), As-Welded Condition, Primarily Pipe App

  • 【Date】1905/6/18
  • 【Reaffirmed Date】(R 2007)
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS B2.1-1-202
  • Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 3/4 Inch Thick, E6010 (Vertical Downhill) Followed by E7018 (Vertical Uphill), As-Welded Condition, Primarily Pipe Appli

  • 【Date】1905/6/18
  • 【Reaffirmed Date】(R 2007)
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS B2.1-1-201
  • Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 3/4 Inch Thick, E6010 (Vertical Uphill) Followed by E7018 (Vertical Uphill), As-Welded Condition, Primarily Pipe Applica

  • 【Date】1905/6/18
  • 【Reaffirmed Date】(R 2007)
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS B2.1-1-203
  • Standard Welding Procedure Specification (WPS) for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 Through 3/4 Inch Thick, E6010 (Vertical Uphill), As-Welded Condition (Primarily Pipe Applications)

  • 【Date】1905/6/18
  • 【Reaffirmed Date】(R 2007)
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS FMS D
  • Suggested Filler Materials for Welding Structural Steel Desk Chart - To Purchase Call 1-800-854-7179 USA/Canada or 303-397-7956 Worldwide.

  • 【Date】1905/6/18
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS FMS W
  • Suggested Filler Materials for Welding Structural Steel Wall Chart - To Purchase Call 1-800-854-7179 USA/Canada or 303-397-7956 Worldwide.

  • 【Date】1905/6/18
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS FMS WC & DC
  • Suggested Filler Materials for Welding Structural Steel, Wall Chart and Desk Chart - To Purchase Call 1-800-854-7179 USA/Canada or 303-397-7956 Worldwide.

  • 【Date】1905/6/18
  • 【Language】English
  • 【Status】Active
  • 【Organization】AWS
  • 【Document #】AWS PHSP WC & DC
  • Suggester Filler Materials and Minimum Preheat Temperatures for Welding Steel Pipe with Wall Thickness Less than 3/4", Wall and Desk Charts

  • 【Date】1905/6/18
  • 【Language】English
  • 【Status】Active