
DoD
Search Result: About 41710 results.
Breadcrumb
- Home
- Industry standards
- Search Result
- 【Organization】DoD
- 【Document #】AS MIL-STD-5522 VALID NOTICE 3
Test Requirements and Methods for Aircraft Hydraulic and Emergency Pneumatic Systems
- 【Date】2018/11/13
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】CC MIL-PRF-29504/21 VALID NOTICE 1
Test Terminus, Fiber Optic, Keyed, Removable, use in Optical Loss and Optical Continuity Testing, Rear Insert/Rear Release through a Test Terminus Adapter, 1.25 MM Ceramic Ferrule, (for MIL-PRF-64266 Connectors)
- 【Date】2018/11/13
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】GS1 MIL-DTL-38394E VALID NOTICE 2
Transmitter, Pressure TRU-81/A, Oil, 0-500 PSI
- 【Date】2018/11/13
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】CC MIL-DTL-85/2F VALID NOTICE 1
WAVEGUIDES, RIGID, RECTANGULAR (HEAVY WALL)
- 【Date】2018/11/13
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】CR MIL-PRF-49467/5D (1)
CAPACITOR, CERAMIC, MULTILAYER, HIGH VOLTAGE, 5,000 V DC, STYLE HV05
- 【Date】2018/11/12
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】OPNAV OPNAV 3090.1A
(N2N6) COMMAND, CONTROL, COMMUNICATIONS, COMPUTERS, AND INTELLIGENCE CAPABILITY REQUIREMENTS DEFINITION FOR NEW CONSTRUCTION AND CONVERSION SHIPS
- 【Date】2018/11/9
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】CC MIL-PRF-64266/26 VALID NOTICE 1
Connectors, Fiber Optic, Rectangular, Alignment Sleeve Retainer (ASR), Both Backplane and Card Front Edge Style, Multiple Removable Termini, Single Fiber Cables, Nonenvironment Resisting, Temperature Ranges 1 and 2
- 【Date】2018/11/9
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】CC MIL-PRF-64266/24 VALID NOTICE 1
Connectors, Fiber Optic, Rectangular, Receptacle, Backplane Style, Multiple Removable Termini, Single Fiber Cables, Blind Mated, Nonenvironment Resisting, Temperature Ranges 1 and 2
- 【Date】2018/11/9
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】AR MIL-HDBK-1226 VALID NOTICE 2
Design of Projectiles for Terminal Effects
- 【Date】2018/11/9
- 【Language】English
- 【Status】Active
- 【Organization】DoD
- 【Document #】DODD DODD 4140.01-M VOL 2
DOD SUPPLY CHAIN MATERIELMANAGEMENT PROCEDURES: DEMAND AND SUPPLY PLANNING
- 【Date】2018/11/9
- 【Language】English
- 【Status】Active